HOME
ABOUT AGE...
INFRASTRUCTURE PROJEC.
SUPERSTRUCTURE PROJEC.
PROJECTS IN PROGRESS
OUR MACHINERY
AGE IN PRESS
HUMAN RESOURCES
CONTACT US
 
 
CONTACT US...

AGE İNŞAAT ve TİC. A. Ş.
Tahran Caddesi No:19
06700 Kavaklıdere
Ankara / TURKEY 
Phone
:
+90312 468 8240
Fax
:
+90312 468 8249
E-mail
:
 
...OFFER and COMMENTS...
SIGN
 
 

 

AGE Construction and Trading Incorporation has been developing advanced technology and team organizations corporately with  its experienced executives, qualified technical personnel, equipped work machineries and units for domestic and international projects and assuring  their sustainability since its establishment in 1974 until today …

Our Infrastructure Projects (SARMAŞIK 1 HEPP) (In progress…)
Our Infrastructure Projects (SARMAŞIK 1 HEPP) (In progress…)

ÜA run-off river hydroelectric power plant called SARMASIK I HEPP PROJECT having power generation capacity of 95,43 GWh/year with installed capacity of 22 MWm/20 MWe will be established on Maki Stream around the Trabzon Province’s Of – Hayrat District then the electric power will be generated by the License dated 06/09/2007-1301-7 and nr. EÜ/1301-7/940 issued by EPDK (Energy Market Regulatory Authority)...

Details
Our Superstructure Projects (SOYAK EVRAKA – ISTANBUL) (In progress…)
Our Superstructure Projects (SOYAK EVRAKA – ISTANBUL) (In progress…)

Its Total Construction Area is 76.000 m2 and has 8 blocks composes of 812 residences which each one has 12-13-14 floor levels and social facilities (outdoor swimming pool, kids club, administrative building, cafeteria, sport spaces, kids play spaces, parking lots and garages and used materials are dual lift system, central heating system, complete kitchen, bathroom, wooden interior doors, pvc windows, aluminum...

Details
Our Superstructure Projects (TOKI – EDIRNE) (In progress…)
Our Superstructure Projects (TOKI – EDIRNE)  (In progress…)

Its construction is in progress in Edirne and has 49 blocks composes of 784 residences which each one has 5 floor levels and social facilities (one each primary school, mosque, business center, kindergarten, health center) and each building has central heating system, complete kitchen, bathroom, wooden interior doors, pvc windows, aluminum suspended ceiling for wetted areas, parquet flooring at rooms, ceramic tile flooring...

Details
Our Superstructure Projects (TOKI – BANDIRMA ) (In progress…)
Our Superstructure Projects (TOKI – BANDIRMA )  (In progress…)

Its construction is in progress in Bandırma – Balıkesir and has 49 blocks composes of 838 residences which each one has 5-6-7 floor levels and social facilities (one each primary school, mosque, business center, kindergarten, health center) and each building has central heating system, complete kitchen, bathroom, wooden interior doors, pvc windows, aluminum suspended ceiling for wetted areas, parquet flooring at rooms...

Details
 
Copyright ©2007 AGE CONSTRUCTION & TRADING INCORPORATION